TECHNICAL COORDINATION

How Fit-out Contractors Work With Consultants

Guide for architects on what to expect from a professional fit-out contractor.

The Consultant-Contractor Relationship

What Consultants Need

  1. Shop drawing competence
  2. Proactive coordination
  3. Transparent timelines
  4. Material knowledge
  5. Clean handover

The Ideal Workflow

  1. Consultant issues design drawings
  2. Contractor produces shop drawings (5-7 days)
  3. Consultant reviews (3-5 days)
  4. Procurement + fabrication
  5. Installation with progress updates
  6. Joint inspection + handover